Replacing a PRS Cooling Roll: What to Confirm Before the RFQ
Prepare a PRS cooling roll replacement RFQ with the stand position, mounting dimensions, rotary union details, operating conditions and inspection criteria.

To quote a replacement PRS cooling roll, identify its exact position in the pull-roll stand and provide the mounting drawing, coolant connections and operating conditions. If the roll is being replaced because of uneven temperature, leakage or a mechanical fault, describe that symptom and its operating context so the supplier can address it in the quotation.
Confirm which roll the line needs
Mark the position on a stand layout and include the line manufacturer, equipment model and roll reference if available. The same line may also have a casting chill roll near the die, so identify the station on the drawing and in the purchase description. State whether the replacement must reuse the existing bearings, drive parts and rotary unions.
Record the dimensions that control fit
Send the latest drawing revision and note any differences found on the installed assembly. Include working face width, overall length, diameter, journal diameters and fits, shoulder positions, and drive-end details such as a keyway or coupling. Label both ends on the drawing. If a measurement comes from a worn part, identify it as a measured value and ask the supplier to confirm the intended fit before manufacture.
Document the coolant circuit
Identify the inlet and outlet ends, connection sizes and thread or flange details, and the rotary union model where known. Share the coolant type, normal inlet temperature and available flow and pressure at the roll. If readings are available only at the plant header, mark them as header measurements. When the RFQ concerns uneven cooling, describe where it appears across the web and whether it changes with production speed or coolant conditions.
Agree what the supplier will verify
State the normal and maximum operating speeds and any required surface finish. Specify the reference surfaces and measurement method for runout. Agree which dimensional reports, balance records and coolant-circuit test records should accompany the roll. If a requirement is still open, identify it in the RFQ so quotations show the same assumptions.
Send a marked stand layout, the current drawing, end-connection photos and the operating data to start the review. See the PRS Cooling Roll product page for the related roll type and the roller inspection checklist for acceptance planning.
HUATAO ROLLS